Summary

On March 6, 2025, at approximately 09:31 UTC, a network misconfiguration on router caused an outage, rendering the router and other dependent infrastructure unreachable. Reversing the misconfiguration did not immediately restore network connectivity, leading to an 18-minute downtime until a router reboot resolved the issue. The outage impacted a lower era points for our validators, while our RPC nodes SLA allows ~40 mins of weekly downtime.

Technical Details

The issue arose when configuring our router & switch infra. Approximately 1-3 minutes later after doing the suspected cause the infra is not reachable using ssh and our proxy for ssh is inside the infra. And after tried to use WireGuard, we can ssh into the router and reverse the changes. However, this reversal did not take effect immediately, leaving the router in a stuck state where SSH access was unreachable. This situation persisted until a manual reboot restored proper functionality.

Response Timeline

  • 09:31 UTC: Network outage occurred & connectivity loss detected
  • ~09:37 UTC: Connectivity with WireGuard established
  • ~09:38 UTC: Reversal of the root cause, but not solve the problem
  • ~09:47 UTC: Decision to reboot the router
  • 09:49 UTC: Service restored after rebooting the router

Mitigation

The immediate resolution was to reboot bkk50, which restored its functionality as the network gateway. However, this incident highlighted the lack of a fully redundant infrastructure.

Impact

  • Network downtime lasted approximately 18 minutes, affecting internal infrastructure.
  • No major disruption to services, but some validators experienced mildly lower era points in Era 7801 for Kusama and Era 1738 for Polkadot.
  • No impact on RPC services, which remain within SLA allowances (weekly downtime limit: 40 minutes).

Current Status and Future Plans

The network is now fully operational. However, this incident underscores the need for more robust redundancy and streamlined access to critical infrastructure.

Future Work

Identified Problems:

  • Lack of a redundant fallback mechanism for critical routers.
  • Current proxy method for router access relies on internal infrastructure instead of an external jump server.
  • Forced reliance on WireGuard VPN for emergency access, which can be cumbersome.

Improvement Plan:

Jump Server Access: Configure external jump server access, allowing:

  • Simple SSH access via ssh router_name@jump.rotko.net.
  • Users to have pre-configured jump configurations on their machines.
  • Access management via per-user SSH authorized_keys file.

Network Redundancy:

  • Improving infra setup to have more redundancy.